Project Description:
Balarabe Musa Crescent is a Circular Road with a short Access Neck that joins Samuel Manuwa Street, in Victoria Island. It is approximately 950m Road in length with varied Right of Way of 12.0m – 14.0m.
The Reconstruction included extensive earthworks, provision of a Crushed Stone Base and Interlocking Paving Blocks Finish to the 7.0m wide Carriageway. The drainage has an internal dimension of 1.2m wide by (1.0m – 1.4m) varies depth on both side of the Roadway with top slap serving as pedestrian walkway.
There are provision of service duct crosses the Road at 4No locations for utilities works. There are also provision of Street light at both sides of the Roadway, powered by a 30KVA MANTRAC Generator within the Generator house all included in the Contract.
Project Description:
The Reconstruction of Samuel Adedoyin is approximately 200m Road length with varied 15.0m – 16.0m Right of way.
The Reconstruction included extensive earthworks, Provision of a Crushed Stone Base and Interlocking Paving Blocks Finish to the 11.0m Single Carriageway wide with provision of Parking Spacing on both sides. The Drainage has an internal dimension of 1.2m wide by (1.0m – 1.2m) depth on both sides of the Roadway, with the top serving as Pedestrian Walkway.
There are provision of 2No service duct crosses the Road at two (2No) locations for utilities works, as well as provision of 14No (Solar Powered) Street light at 30m interval at both sides of the Roadway.
Project Description:
Rehoboth Close is approximately 170m Road length with varied 8.0m – 10.m right of way.
The Construction included extensive earthworks, provision of a Crushed Stone Base and Interlocking Paving Blocks Finish to the 7.0m – 8.0m wide Single Carriageway with underground drainage with internal dimension of 1.0m wide (0.4m – 1.2m varied depth) on one side. The Roadway is lined with kerb on both sides with provision of 3No – 150mm uPVC sleeves on one side and the top slab of 1.2m serving as Pedestrian Walkway. There are provision of 8No (Solar Powered) Street light at 25m interval on one side of the Roadway.
Project Description:
The Reconstruction of Magbon Close is approximately 175m Road length with varied of between Right of way, of 10.0m – 12.0m.
The Reconstruction included extensive earthworks, Provision of a Crushed Stone Base and Interlocking Paving Blocks Finish to the 7.2m wide Carriageway. The drainage has an internal dimension of 0.9m wide by 0.7m depth on both sides of the road with drain top slab serving as walkway.
There are provision of 12No (Solar Powered) street light at 30m interval on both sides and a provision of 2No – 150mm uPVC sleeves along the Road side on both sides for utilities works.
Project Description:
The Construction of OPAL Warehouse Complexes Road is a network roads and Hardstanding Area that links the warehouses together for effective logistics and Storage facilities.
It is a 150mm thick reinforced concrete road single and dual carriageway with underground piped drainage connectivity taken surface Runoff from the paved surface to designated outfall/sink at the rear of the complexes Premises.
Project Description:
ANOH Gas Processing Company is a Gas Processing Company which Expanded and Developed their Field Base Buildings and Facilities. Our main Task was to produce Structural Engineering Detailed Designs and Drawings for the highlighted ForwardBase Facilities;
FLB 01 – FLB Restaurant, Office & Clinic Building
FLB 02 – Lounge Building
FLB 03 – Gym. & Communal Shower Building
FLB 04 – Facility Manager's Office Building
FLB 05 – Residential Blocks–Standard, 13 no.
FLB 06 – Residential Block–Executive, 1 no.
FLB 07 – Laundry Building
FLB 08 – Lawn Tennis Court (2 No.)
FLB 09 – Five–a–Side Football Pitch
FLB 10 – Basketball Court
FLB 11 – Skip Block
FLB 12 – Electrical / IT Services Building
Military Unit Caravans
PA 01 – Inplant Admin. Building
PA 02 – Warehouse
PA 03 – Workshop Building
PA 04 – Chemical Storage Shed
PA 07 – Fire Station Building
PA 08 – Truck Loading Admin. Building
PA 09 – Drivers Rest Room–Lounge
PA 10A-B – FLB Access, LPG Area Entrance & Exit, and Plant Area Gate Houses
Covered Walkway
Luxurious Residental Apartments
Crown Jubilee @ Plot 10B Block 8
Parkview Estate, Ikoyi Foreshore
Nigeria
Mike Adenuga Centre Complex
(Housing the Alliance Francais, Lagos)
@ 9 Osborne Road, Ikoyi, Nigeria
Waterfront Mansion
@ Plot J48, 223 Close
Banana Island, Nigeria